MYLOPOTAMOS
Design and EIA of a 154,000m³ reservoir on Ios Island for water supply and irrigation. Included flood protection, sediment control, and mitigation of ecological and landscape impacts.
Design and EIA of a 154,000m³ reservoir on Ios Island for water supply and irrigation. Included flood protection, sediment control, and mitigation of ecological and landscape impacts.
Environmental Impact Assessment for the Kyparissia–Romanos road section under the Community Framework Programme II. Focus on minimizing impacts such as soil erosion, noise, and water pollution during road alignment and bypass works.
The project developed a guide for assessing environmental impacts of small hydropower plants (SHP), including best practices, EIA steps, and evaluation of physical, biological, and socioeconomic environments.
The project supported the National River Basin Monitoring Network (NMN) in Greece, including data quality control, database development, annual reporting, and revision of monitoring stations in line with WFD.
The project aimed to environmentally upgrade Thriassio Pedio through integrated town planning, industrial activity control, and the rehabilitation of degraded areas across Elefsina, Aspropyrgos, Mandra, and Magoula.
Promoting climate adaptation acceleration by testing water-focused innovations in European demonstrators. Delivered socio-economic modelling tools, co-created adaptive pathways, and designed replication-ready solutions with impact evaluation.
The project concerns the design of the Canoe-Slalom Olympic Center and supporting infrastructures. The up to date stadium design concerns mainly an artificial channel which simulates a river’s natural flow.
OLYMPIC CENTRE Canoe-Slalom Read More »
The main objective of ACHERONTAS project was the Environmental Impact Assessment for the Agricultural Development of the Acherontas Region.
The project delivered applications of hydraulic scenarios for flood forecasting and water management for the watersheds (areas) megalo monastiri, mirko peribolaki, velestino, and skopelos in the Region of Thessalia, Fourka, sikia in the Region of Macedonia, and Thasos.
River Basin Management Of watersheds Read More »
The aim of the study has been the investigation of the environmental impacts of the exploitation of the geothermal reservoir in N. Kessani and introduction of mitigation measures, for a major development plan considering energy production, use of thermal water for greenhouse operations and use of water for thermal surface water enrichments for industrial purposes