AIGIO
The project involved an Environmental Impact Assessment for the 70ha Industrial Area in southeastern Aigio, aiming to relocate existing industrial units, protect residential areas, and foster new industrial development.
The project involved an Environmental Impact Assessment for the 70ha Industrial Area in southeastern Aigio, aiming to relocate existing industrial units, protect residential areas, and foster new industrial development.
Proposed to deploy a multi-tier cybersecurity and threat-detection platform for protecting water infrastructure using IoT, UAV/USV surveillance, and AI analytics. Covered early-warning, anomaly detection, physical intrusion prevention, and cyberattack countermeasures.
Proposed to support border surveillance using Copernicus SAR data to detect high-speed “go-fast” smuggling boats. Combined Sentinel-1 data analysis, ship wake detection, and AIS fusion for activity pattern analysis in Mediterranean sea corridors.
Proposed to design modular biosensors for detecting pollutants in water using advanced materials, RNA-based elements, and fiber-optic or microelectronic systems. Targeted TRL5 with in situ validation, LCA analysis, and integration with EU environmental data platforms under Zero Pollution Action Plan goals.
Implemented integrated coastal ecosystem management on Salamina Island through water quality monitoring, pollution modelling, and satellite analysis. Pilots addressed waste management, coastal restoration, and marine habitat protection under MEDSPA funding.
EIA for a hydroelectric scheme at Metsovitikos involving dam construction and flow regulation. Focused on soil stability, biodiversity, flow regime, waste disposal, and income benefits for the local area.
Rehabilitation management study of Potamos Kerkyras focused on riverbed restoration, pollution reduction, flooding prevention, and visual/ecosystem enhancement using phased interventions and alternative financing.
Construction and operation of the Gadouras Dam on Rhodes, supplying water to eastern regions and supporting irrigation. Addressed erosion, fauna disruption, sedimentation, and required constant downstream flow for biodiversity conservation.
Port extension on the western side of Souda Bay. Addressed dredging, breakwater construction, and expected traffic increase, with mitigation measures for oil spills, sea pollution, and construction-related waste.
Development of new port facilities west of the existing port in Elefsina. Scope included breakwater construction, dredging, and infrastructure enhancement, with emphasis on MARPOL compliance, pollution control, and landscaping.