METSOVITIKO
EIA for a hydroelectric scheme at Metsovitikos involving dam construction and flow regulation. Focused on soil stability, biodiversity, flow regime, waste disposal, and income benefits for the local area.
EIA for a hydroelectric scheme at Metsovitikos involving dam construction and flow regulation. Focused on soil stability, biodiversity, flow regime, waste disposal, and income benefits for the local area.
Environmental Impact Assessment for the Platamon section of the Athens–Thessaloniki High-Speed Railway. Evaluated air quality, noise, landscape aesthetics, and cultural heritage, with mitigation measures including noise barriers and slope planting.
Rehabilitation management study of Potamos Kerkyras focused on riverbed restoration, pollution reduction, flooding prevention, and visual/ecosystem enhancement using phased interventions and alternative financing.
Creation of the “ECOS” Center at St. Petersburg Technical University under the Tempus-Tacis program. Delivered training on environmental economics and developed curricula in agriculture, energy, and transport.
Water diversion from Metsovitikos River to Lake Pamvotida aimed at enrichment and supply. Covered EIA issues such as slope stability, waste management, flooding reduction, and land use change.
Construction and operation of the Gadouras Dam on Rhodes, supplying water to eastern regions and supporting irrigation. Addressed erosion, fauna disruption, sedimentation, and required constant downstream flow for biodiversity conservation.
Port extension on the western side of Souda Bay. Addressed dredging, breakwater construction, and expected traffic increase, with mitigation measures for oil spills, sea pollution, and construction-related waste.
Development of new port facilities west of the existing port in Elefsina. Scope included breakwater construction, dredging, and infrastructure enhancement, with emphasis on MARPOL compliance, pollution control, and landscaping.
Design and EIA of a 154,000m³ reservoir on Ios Island for water supply and irrigation. Included flood protection, sediment control, and mitigation of ecological and landscape impacts.
Environmental Impact Assessment for the Kyparissia–Romanos road section under the Community Framework Programme II. Focus on minimizing impacts such as soil erosion, noise, and water pollution during road alignment and bypass works.