GADOURAS
Construction and operation of the Gadouras Dam on Rhodes, supplying water to eastern regions and supporting irrigation. Addressed erosion, fauna disruption, sedimentation, and required constant downstream flow for biodiversity conservation.
Construction and operation of the Gadouras Dam on Rhodes, supplying water to eastern regions and supporting irrigation. Addressed erosion, fauna disruption, sedimentation, and required constant downstream flow for biodiversity conservation.
Port extension on the western side of Souda Bay. Addressed dredging, breakwater construction, and expected traffic increase, with mitigation measures for oil spills, sea pollution, and construction-related waste.
Development of new port facilities west of the existing port in Elefsina. Scope included breakwater construction, dredging, and infrastructure enhancement, with emphasis on MARPOL compliance, pollution control, and landscaping.
Design and EIA of a 154,000m³ reservoir on Ios Island for water supply and irrigation. Included flood protection, sediment control, and mitigation of ecological and landscape impacts.
Environmental Impact Assessment for the Kyparissia–Romanos road section under the Community Framework Programme II. Focus on minimizing impacts such as soil erosion, noise, and water pollution during road alignment and bypass works.
The project developed a guide for assessing environmental impacts of small hydropower plants (SHP), including best practices, EIA steps, and evaluation of physical, biological, and socioeconomic environments.
The project extended the EUGas model to 10 EU countries, integrating national gas transmission systems in a GIS environment to assess infrastructure resilience under geopolitical and technical stress scenarios.
The project supported the National River Basin Monitoring Network (NMN) in Greece, including data quality control, database development, annual reporting, and revision of monitoring stations in line with WFD.
The project aimed to environmentally upgrade Thriassio Pedio through integrated town planning, industrial activity control, and the rehabilitation of degraded areas across Elefsina, Aspropyrgos, Mandra, and Magoula.
Conducted hazard analysis and emergency planning for Valletta’s cruise terminal. Delivered evacuation protocols, risk scenario modelling, and tabletop exercises for Transport Malta.